I have a little customer service issue I'm dealing with. A buyer of one of my houses is having problems modifying the house. The build is packaged and sold with Mod enabled. I made one set of adjustments for this customer since he couldn't edit the build. I double checked the house by passing a copy to an alt (one that does not have modify perms to my objects), where I was able to rez, modify, unlink, delete as expected. I then sent the build that I had customized and double checked to the customer. He still cannot modify or unlink the pieces to edit the house.
The house is packaged with Rez-Faux, but this hasn't ever been an issue and wasn't an issue for my testing alt.
Any suggestions as to why he has not been able to modify two succesive builds? I really don't want to keep doing the modifications to this house for him anytime he wants to change a prim.
Thanks!
